Exterior: [ Sails and Covers ] [ Mast Fixin's ] [ Various Glass Repairs ] [ Tiller ] [ Sliding Hatch ] [ Companionway Ext Trim ] [ Forward Hatch ] [ Lazarette ] [ Engine Compartment ] [ Lo-Fat Engine Well Vents ] [ Stern Railing ] [ Life Lines ] [ Bottom Job ]
Interior: [ Interior Before ] [ Companionway ] [ Quarter Berth ] [ Nav Station ] [ Galley ] [ Dinette ] [ Head ] [ Hanging Locker ] [ V-Berth ] [ Sole Storage ] [ Aft Sole ] [ Head Liner ] [ Cabin Upholstery ] [ Battery Box ] [ Electrical ] [ Cabin Lighting ] [ Misc Projects ]
[ Bring Her Home ] [ Haul Out 101 ] [ Transporting ] [ New Moorage 2008 ] [ Things 2 Do ] [ Wood Finishing ] [ Sail Sizes ] [ "Labor of Love" Log ]

Hanging Locker


This is before I did anything to the hanging locker.



After removing the stereo and sanding the bulkhead. The stereo will be replaced with a new am/fm/cd player with aux in for an MP3 player and relocated as well as this super-bright light.


After removing the upholstery pad and checking for leaks at the hull to deck joint.



The lower part of the hanging locker. This too shall be reworked. I don't much care for the shore power connection being in this space. The shore power will be relocated to the aft cabin and a shore power connector will be fitted to the cabin somewhere, but not in the hanging locker where the wet gear will hang. The shore power connector is a direct connect from the cable to the fourplex outlet with no breaker in between.